Week-Long Water Crisis Cripples Karachi: Burst Pipes Blamed
Pakistan's largest metropolis, Karachi, remains parched as a water supply crisis persists into week two, rooted in ambitious but disruptive pipeline upgrades. On April 21, KWSC closed Line No. 5 near...
Pakistan's largest metropolis, Karachi, remains parched as a water supply crisis persists into week two, rooted in ambitious but disruptive pipeline upgrades. On April 21, KWSC closed Line No. 5 near Dhabeji Pumping Station, installing a hefty 72-inch pipe and slashing 250 MGD—40% of the city's 650 MGD supply, far below the 1,200 MGD required. Restoration hit snags with power cuts, and Monday's pipeline ruptures from outages added 140 MGD losses, hammering districts including Malir, Korangi, Landhi, and elite Clifton. By Friday, bursts were sealed, but new leaks in Gulshan-e-Hadeed prolonged the agony, with Thursday's shortfall at 80 MGD. Voices from the ground paint a grim picture: no water for a week means tanker dependency and skyrocketing costs, as per Abdul Ghafoor. Women and families speak of prolonged dry spells, turning routine life upside down. As the crisis unfolds, it exposes deeper systemic failures in urban water management. Calls grow for government intervention, alternative sourcing, and power backups at vital stations. With no end in sight, Karachi's residents brace for tougher days ahead unless decisive action prevails.