Army Engineers Reach Tunnel Opening but Not Power Facility in Nepal Flood Aftermath
In the wake of the Bhote Koshi river overflow, the Nepal Army dispatched a mixed team of engineers and drone operators to the Rasuwagadhi Hydro Power tunnel. The team managed to enter the segment where the tunnel widened to a 1‑2 foot gap, but found the passage blocked further downstream. Without drilling rigs or other heavy‑duty gear, the rescuers were forced to retreat, leaving the underground power house untouched. Officials highlighted that the same equipment used in the Upper Trishuli projects could enable a breakthrough.