New battery system at Haryana plant cuts 54 tonnes CO2 yearly
Maruti Suzuki India announced the start‑up of a 1 MWh Battery Energy Storage System (BESS) at its Kharkhoda facility on July 8. The storage unit is integrated with the plant’s internal electrical grid, capturing surplus power produced by the on‑site 20‑MW solar farm.
During low‑demand periods, the solar plant previously generated more electricity than the factory could consume, leading to waste. The BESS now holds that excess energy and releases it when demand spikes, improving overall solar utilisation and providing a buffer that supports grid reliability.
Company executives highlighted that the system’s 15‑year operational horizon will prevent about 54 tonnes of CO₂ from being emitted each year, reinforcing Maruti Suzuki’s pledge to lower its environmental impact.
The initiative dovetails with the parent Suzuki Motor Corporation’s ambition to achieve a 42 % reduction in Scope‑1 and Scope‑2 emissions by the 2030‑31 fiscal year relative to 2023 figures, reflecting a long‑term commitment to greener manufacturing.