Tag: multipurpose

  • Availability of water from solar dual pump is becoming very useful for villagers

    The state government is providing water through solar dual pump by CREDA department to empower the villagers and farmers financially. The availability of water from solar energy is proving to be very useful, including drinking water and other resources of the villagers. Due to this scheme, now dependent women do not have to go far for water. Now they have easy access to water nearby.
    It is noteworthy that in the remote and forested areas of the state, production is being increased with the encouragement of farming and farming by solar dual pump, pure water is also being provided for drinking water. Officials of the CREDA department said that the villagers of village Paradol, Kaparia and village Baskhohar under development block Bharatpur in Koriya district are earning additional income by producing vegetable and vegetable in the land through solar dual pump. Also, the water derived from solar energy is proving to be very useful for the villagers and farmers. At the same time, there is also cooperation in the direction of economic empowerment.
    Officials said that under the CREDA department’s plan, solar dual pump is already installed in the borewells available in the farmers’ farmland, thereby providing water for drinking and other works without any labor during the daytime availability of solar radiation. Availability. In this arrangement, along with solar pumps, a tank of 5 to 10 thousand liters is also installed at a certain height. Which provides additional arrangement for drainage from 4 stand post taps. Due to this scheme, now dependent women do not have to go far for water. Now they have easy access to water nearby.
    Along with this, Bari development is also being encouraged under Narva, Garva, Ghurwa, Bari. Vegetables are being produced by villagers with the availability of water. Produced greens and vegetables are being used for home as well as being sold for extra income. This is helping them to meet the needs of the family.

  • Realme launches its new smartphone Realme 7 5G

    Smartphone maker Realme has launched its much-awaited new smartphone Realme 7 5G during a virtual event held in the UK. This smartphone has been launched as an upgrade version of Realme 7, Realme 7 Pro and Realme 7i. The company claims that Realme 7 5G is one of the cheapest 5G smartphones in Europe. Talking about the price of Realme 7 5G, its price in the UK right now is around GBP 279 (Rs 27,400). The company has fixed this price for 6GB + 128GB variants. It will start selling in the UK from 27 November.

    Talking about its specification, Realme 7 5G equipped with MediaTek Dimension 800 U processor and 6GB RAM works on Realme UI based on Android 10. It has a 6.5-inch full-HD + hole-punch display. Talking about the camera, the primary camera of Realme 7 5G is 48 megapixels, with an 8 megapixel ultra wide angle camera, 2 megapixel macro camera and 2 megapixel monochrome sensor. A 16-megapixel front camera has been given for those who are interested in selfies. Talking about other features of the camera, many pre-loaded features such as time lapse photography, HDR, ultra-wide angle, super macro, AI beauty are already present.

    Talking about Realme 7 5G storage, this smartphone has 128GB of maximum storage which can be increased to 256GB with the help of micro SD card. For connectivity, it has 5G, 4G LTE, Bluetooth 5.1, GPS / A-GPS and USB Type-C port. It is equipped with an in-display fingerprint sensor. This smartphone has a powerful battery of 5,000 mAh which comes with 30 watt dart charge support. The company claims that this smartphone gets fully charged in just 65 minutes.

  • Land acquisition for setting up Nagarnar Steel Plant will be completed by the end of November

    The Cabinet Secretary of the Government of India, Shri Rajiv Goba today inquired from the Chief Secretaries of the state about the progress of multi-purpose road project-rail project-iron-steel projects being constructed in the states through video conferencing. Mr. Goba inquired about the steel plant to be set up in Nagarnar village in Bastar district of Chhattisgarh. Chief Secretary Shri R.P. The Board informed that out of 61 villages affected by the construction of Nagarnar Steel Plant, land acquisition and other processes have been completed in 57 villages. The process of land acquisition in the remaining four villages will be completed by the end of November 2020. Additional Chief Secretary Forest Industry Department Mr. Manoj Pingua and Secretary Revenue Department Ms. Rita Shandilya were also present in the meeting.