Today, Jal Shakti Minister Swatantra Dev Singh conducted on-site inspection of flood works to deal with the possible floods of Hardoi district. First of all, Hon’ble Minister inspected village Katri Parsaula. During this, Executive Engineer Akhilesh Kumar Gautam informed that under the project, work has been proposed for the construction of five nos. Geobag spur and 18 nod. Percupine spur in 1752 meter length. As per the requirement of the work site, the work of 16 nos. Percupine spur and 05 no. of Geobag spur has been completed. The work of installing the Geobag gabion in the proposed length of 1752 meters has been completed. To protect the banks of the river from erosion, the work of installing chapa grass is in progress. The work of planting grass will be completed with the arrival of monsoon. Shri Singh instructed Executive Engineer Akhilesh Gautam to complete the work of filling the forest and planting of grass before the water level of the river rises in Percupine. He said that the Uttar Pradesh government is taking full precautions regarding flood control. The villagers thanked the Hon’ble Minister for the successful efforts to stop the erosion from the river Ganga in the last years. 09 Nos. Percupine spur work was proposed as work. Spur construction work has been completed. In order to protect the banks of the river from erosion, the work of installing chapa grass is in progress. With the arrival of monsoon, the work of planting grass will be completed. The villagers thanked the Hon’ble Minister for the successful efforts to stop the erosion from the Garra river in the villages Manimau, Bamhtapur, Janiyamau, Tadaura, Chitramau, Kahartola, Babarpur, Mirkapur, Mohaddinpur and Nonkhara South in the last years. Jai Prakash and Hon’ble MLA Sawaijpur apprised the Hon’ble Minister regarding the flood problems occurring in Tehsil Sawayajpur and Bilgram from Garra, Ram Ganga, Ganga, Neelam and Gambhiri rivers in the district and to solve the problems of erosion from the river. The success of the works was also apprised. Information about the anti-erosion work was given to the Minister. During this, MP Jai Prakash, Saurabh Kumar Mishra, MLA Sawaijpur Madhavendra Pratap Singh and District Magistrate Avinash Kumar, Deputy District Magistrate Bilgram Rahul Kashyap Vishwakarma, Deputy District Magistrate Sawaijpur Rakesh Kumar Singh etc. Deputy be located. Like this:Like Loading… Continue Reading
Leave a Reply