The release said apart from the new terminal building, the AAI is scheduled to build new apron and taxi-track to make the airport suitable for handling two A320 aircraft at a time.
The release said apart from the new terminal building, the AAI is scheduled to build new apron and taxi-track to make the airport suitable for handling two A320 aircraft at a time.
Leave a Reply