New Regulations Require Active Rainwater Harvesting for 4‑Inch Borewells in Ranchi
Facing a persistent drop in groundwater levels, Ranchi's municipal corporation has tightened the rules governing borewell construction. The fresh regulations mandate that a rainwater harvesting system be fully operational before a four‑inch borewell can be sanctioned.
The council has classified the new policy into two sections: residential and commercial. For homes, the presence of a working rainwater harvesting unit is now a non‑negotiable criterion for any borewell permit. Commercial entities must also comply, in addition to installing flow‑metering devices on their wells.
Penalties for non‑compliance are steep. Residential owners who drill without permission will be fined INR 25,000, and commercial operators face a fine of INR 100,000. The authority reserves the right to seal any illegal borewell found during inspections.
Permit fees have been clarified. Residential units up to 5,000 square feet are charged INR 2,500, while larger residences pay INR 5,000. Commercial premises up to 1,000 square feet incur a fee of INR 10,000, and larger commercial spaces are charged INR 10 per square foot.
The approval must be acted upon within fifteen days; failure to complete the borewell in this window results in automatic cancellation of the licence. Only one borewell per property owner is permitted, and structures already equipped with a six‑inch borewell are barred from obtaining an additional four‑inch borewell.
No borewell permits will be issued for drilling on public land, roads, watercourses, or drainage channels. Prior to granting permission, an engineer will conduct a site visit to verify the rainwater harvesting system and ensure compliance with the new guidelines.
Prospective applicants are required to file an application with the water supply department, accompanied by identity documents, property tax receipts, GPS‑validated photographs of the proposed drilling site, specifications and images of the rainwater harvesting installation, and an affidavit stating that the borewell will be used solely for drinking water and household purposes.
Post‑drilling, owners must submit details of the water level and borewell depth to the municipal corporation for ongoing monitoring and data collection.