Skip to content

New Network Connectivity Planned for Chuttupalu Valley after DC Inspection

By News Analysis India · · 1 min read

Following an on‑ground inspection, Ramgarh’s district commissioner confirmed plans to bring comprehensive mobile coverage to Chuttupalu valley. The area currently suffers from poor signal strength due to the absence of a tower, causing severe challenges for emergency communication.

DC Riturraj instructed the Jio team to identify a suitable location, complete a feasibility study, and fast‑track the construction process. Rapid deployment is intended to shorten response times for medical, police, and rescue operations after accidents.

Discussion also covered mapping of high‑risk zones and the implementation of supplementary safety infrastructure, including warning signs and quick‑access routes.

Participants included senior district officials, the DFO, the confidential branch officer, DPO, UID staff, regional coordinators, and Jio engineers.