Skip to content

Vande Bharat maintenance depot construction in Bhopal

A state‑of‑the‑art Vande Bharat train maintenance depot is under construction at Bhopal Coach Factory, with completion slated for September 2027.

By News Analysis India · · Updated · 1 min read

Vande Bharat maintenance depot construction in Bhopal

Bhopal, November 23 – The Vande Bharat train maintenance depot is being built at the Bhopal Coach Factory premises, aiming to boost upkeep facilities for the premium train in the capital’s railway division. The facility will also cater to LHB coach rakes, incorporating modern equipment to streamline cleaning and servicing processes.

Construction Progress

The Railway Board approved the depot proposal on October 7, 2025, and construction began on June 13, 2026. Phase 1, budgeted at about ₹146 crore, will create six new maintenance lines. Ongoing works include casting the washing‑pit middle wall and side footings, erecting an administrative building, roof shuttering for the electronic interlocking building, reinforcement binding, and casting walls for the sewage treatment plant. Completion is targeted for September 2027.

Expected Benefits

Once operational, the depot will enable medium‑ and long‑term maintenance of Vande Bharat rakes, replacing the current weekly inspection at Rani Kamalapati depot. Two additional pit lines are planned for regular LHB rake servicing, reducing turnaround time and easing pressure on existing facilities. The expanded capacity is expected to improve overall rail operation efficiency and infrastructure resilience.