Surat‑Bilimora Section Marks Start of Mumbai‑Ahmedabad High‑Speed Rail
The Mumbai‑Ahmedabad high‑speed rail corridor will take its first step forward with the Surat‑Bilimora segment.
Approximately 50 km of track connecting the Gujarat towns of Surat and Bilimora is set to launch on 15 August 2027, marking the debut of bullet‑train operations in the country.
This early section serves as a critical testbed for the larger 508‑km corridor, which aims for full service by 2029. The trains, powered by Japanese engineering, will cruise at speeds up to 320 km/h.
Key engineering feats include a 7‑km marine tunnel beneath the Arabian Sea, elevated viaducts that minimise land acquisition, and state‑of‑the‑art stations designed to serve commercial hubs.
The successful rollout of this segment will position Gujarat as the first Indian state to host high‑speed rail, laying the groundwork for nationwide expansion.