Skip to content

Rainy Season Challenges Ganga Expressway, Drainage Issue at Unnao Ramp

By News Analysis India · · 1 min read

Heavy rainfall that has persisted over the past week has not slowed down traffic on the Ganga Expressway, a vital link connecting Lucknow to the northern districts of the state. Engineers report that the main carriageway shows no signs of waterlogging, and the expressway continues to operate at full capacity.

The only exception is a ramp in Unnao where water has pooled after recent downpours. The cause, according to the project management team, is the limited clearance of a nearby high‑tension electric line that interferes with the designed slope of the drainage channels.

R.S. Mishra, the project manager, said that coordination with the electricity department is already underway to shift the line to a safer height once the monsoon subsides. In the interim, the expressway’s maintenance crew is conducting hourly inspections and clearing any excess water to keep the ramp passable.

Travelers are encouraged to follow the posted signage and be alert for any temporary speed reductions near the Unnao ramp, while the rest of the expressway remains unaffected.