Skip to content

Railway Demands Detailed RCA Report and Safety Measures from NHAI

By News Analysis India · · 1 min read

In a formal press release, Mid‑Central Railway instructed the NHAI to submit a comprehensive root‑cause analysis (RCA) for the RE wall failure and to outline immediate safety interventions. The agency has been asked to stabilise the wall, install an effective drainage system, and provide a timeline for full restoration.

The railway expects the NHAI to share the technical design details of the wall, the proposed remedial plan, and a schedule for continuous monitoring of the site. Railway officials have underscored the importance of preventing any recurrence, especially during the heavy rains typical of the season.

The request aligns with standard protocol, wherein the railway seeks assurance that road‑side infrastructure does not pose a risk to the safety of its tracks and rolling stock.