John Swinney Impressed by Gujarat's Gift City Infrastructure
Gandhinagar: John Swinney, First Minister of Scotland, is in Gujarat with a delegation of 11 members for a visit running from October 22 to 25. Swinney's visit has put a spotlight on Gujarat's growth story, with the state seen as a model for development across India.
The delegation visited Gift City, widely regarded as a world-class urban project, on Thursday. Members were briefed on the city's development, its range of financial services, investment avenues, and export sectors. The visitors showed keen interest in the technology behind the city's infrastructure.
The highlight of the visit was the city's ultra-modern utility tunnel system. Swinney praised the advanced technology used in the facilities.
Gift City, the country's first International Financial Services Centre, was built under the leadership of Narendra Modi, who was chief minister of Gujarat at the time and is now the Prime Minister. The project is setting a benchmark in construction, especially for high-rise buildings and densely populated areas.
With the population rising, the city needs reliable supply of electricity, drinking water, cooling, and telecommunications. To meet these needs, Gift City has developed an advanced utility tunnel system that functions as the backbone of the city.
Urban infrastructure repairs often require digging up roads, which causes disruption and spoils the look of cities. Gift City has addressed this problem by constructing underground utility tunnels modeled on successful smart cities worldwide. All service networks run underground, so roads do not need to be excavated.
Only a small strip of land is used for the tunnel. The surface above can host bus stops, footpaths, seating areas, and small shops or kiosks.
The tunnel houses power cables, drinking water pipelines, district cooling pipelines, automated solid waste pipelines, automation cables, and communication cables. Backup-equipped power cables are placed at the top, while water, waste, and communication lines run along the bottom.
Sewage, stormwater, and gas pipelines are kept outside the tunnel in a separate dedicated corridor for safety.
The central control room monitors the entire utility tunnel 24 hours a day using supervisory control and data acquisition technology. If a technical issue arises in any area, the control room alerts the maintenance team immediately so repairs can be carried out without stopping road traffic.
The tunnel has been designed to meet the city's future growth and the requirements of upcoming buildings.
The overall plan includes a 16 km utility tunnel across Gift City. Currently, 5.5 km is fully operational and another 5.5 km is under construction. The rest will be built in phases as the city grows. New buildings are linked directly to the network through their basements.
The utility tunnel reflects Gift City's commitment to eco-friendly, sustainable, modern, and world-class civic facilities.