Skip to content

CM Yogi Calls for Fast Track Road Fixes Ahead of Festival Rush

By News Analysis India · · 1 min read

Lucknow (Sept 11) – In a decisive move, Uttar Pradesh Chief Minister Yogi Adityanath ordered the immediate restoration of streets that have been rendered impassable by monsoon rains. During a high‑level Public Works Department review, he instructed that a continuous eye be kept on road conditions and that fresh inspections be carried out for any new damage caused by the ongoing downpour.

Anticipating massive crowds for upcoming religious and cultural celebrations, the CM warned against any disruption on primary arteries. He mandated that all essential repairs and any needed reconstruction be wrapped up before the festival season peaks.

The chief minister stressed that fixing potholes should go beyond quick patches. Where a road is severely deteriorated, it must be upgraded to a fully motorable state immediately, with long‑term renovation scheduled after the rains cease.

The session also noted that heavy traffic on partially completed expressways, national highways and railway links has aggravated the situation. A systematic survey across departments is being conducted to pinpoint the most affected stretches and to allocate pothole‑removal targets. A total of 681 strategic routes, which see heightened traffic during events like Ganesh Chaturthi, Vishvakarma Puja, Navratri, Diwali, Chhath and Kartik Purnima, have been mapped for priority work.

CM Yogi also reviewed plans with officials from the central road ministry and with heads of market, Panchayati Raj, irrigation, rural development, urban planning, housing and industrial departments, urging cohesive action. The current road‑maintenance drive involves nine departments responsible for roughly 436,000 km of road network, with a target to eliminate potholes on 50,000 km. So far, work on 5,751 km has been completed.

Following the damage survey, each department will set final targets for comprehensive road renewal (30,000 km) and specialized repairs (5,000 km). Progress to date shows 14,000 km renovated and 700 km receiving special attention. The chief minister highlighted that roads are the lifeline of daily activities, connecting schools, hospitals, markets and government offices, and should therefore receive top priority.