Chhattisgarh|
Two-Vehicle Simultaneous Charging and 100 km High-Speed Nodes Planned
N
News Analysis IndiaReporter
October 3, 2026
06:30 AM
A distinctive feature of the upcoming network is the provision for two chargers at every location, enabling two electric cars to charge side‑by‑side. This dual‑charging capability is designed to serve high‑traffic corridors where demand peaks.
For long‑haul journeys, the plan includes a high‑speed charging node every 100 kilometres. These fast‑charge stations will deliver a substantial battery boost in a short time, giving highway travelers the confidence to cover greater distances without frequent stops.
The initiative also mandates that operating firms secure uninterrupted 24‑hour power supply and maintain accurate metering at each site.
