Skip to content

Rs 14.26 Crore Sanctioned for Two Bridges in Mungeli, Bilaspur

By News Analysis India · · 1 min read

Raipur, October 24, 2026: The state government has sanctioned two high-level bridges in Mungeli and Bilaspur districts to improve road links in both regions. The total cost of the two bridges, including their approach roads, is 14 crore 25 lakh 97 thousand rupees.

After the approval of Deputy Chief Minister and Public Works Minister Arun Sao, the Public Works Department has released administrative sanction for both projects.

A safer crossing over the Manyari river in Mungeli

On the Takhatpur-Barela state road in Mungeli district, a new high-level bridge will be constructed over the Manyari river. The structure will replace the current submersible bridge. The administrative sanction for this bridge and its approach road is 7 crore 67 lakh 11 thousand rupees.

Because the existing bridge is submersible, rising river levels can interrupt movement across it. Residents may face difficulties, particularly during the monsoon. The new high-level bridge is intended to reduce these problems and provide a more reliable road link.

Dongana Nala project in Bilaspur

In Bilaspur district, a high-level bridge and approach road will be built over the Dongana Nala on the Belgahna-Konchara-Khongsara road. The sanctioned amount for this work is 6 crore 58 lakh 86 thousand rupees.

The project is expected to provide better travel facilities for local people and strengthen regional connectivity. The new bridge could also benefit daily movement of residents in the area.

Quality and timelines in focus

The state government has instructed the Chief Engineer of the Public Works Department to pay special attention to quality and the set timelines for both projects. Directions have also been issued to use quality construction materials, ensure regular supervision, and comply with the specified technical norms.

The two bridges are expected to add strength to road infrastructure in Mungeli and Bilaspur. The projects may prove significant in offering dependable access on routes where traffic is at risk during high water levels.