Skip to content

Varanasi Gets ₹14,447 Crore Elevated Ganga Link to Ease Traffic Jams

By News Analysis India · · 1 min read

The economic affairs cabinet committee approved a high‑speed, 46‑kilometre elevated corridor that will run parallel to the Ganga, connecting NH‑19 with the Varanasi Ring Road. The ₹14,447.64 crore scheme allocates more than ₹6,000 crore for construction and over ₹540 crore for land purchase. Its key components include a six‑lane elevated mainway, a 910‑metre cable‑stayed bridge over the river, a 1.32‑km extradosed foot‑over‑bridge with travellators to Kashi Vishwanath, and a branch spur from BHU to the opposite ghats to relieve the congested Lanka Chowk. Designed for 80‑100 km/h, the corridor will cut average travel time from an hour to 20 minutes and halve the journey to Kashi Railway Station. Integrated with the PM Gati Shakti national master plan, it will link major highways, the Lal Bahadur Shastri airport, IWT port, and cultural landmarks, fostering smoother logistics, safer roads, and a boost to pilgrimage tourism.