Skip to content

Critical Faults Detected in Bihar’s New Four‑Lane Highway Before Inauguration

By News Analysis India · · 1 min read

A serious breach in the newly constructed four‑lane road in Bihar's Baghlpur district has triggered alarm among engineers and local communities. The defect, a 2‑inch wide crack extending over 40 metres, surfaced on the down‑line that connects Munger to Baghlpur. Simultaneously, the road shoulders are experiencing continuous soil erosion, creating a risk of major accidents once traffic picks up.

The highway, part of a Rs 3,792 crore scheme, was designed to cut travel time between Munger, Mirzachauki and adjacent towns. Yet the early appearance of these anomalies suggests shortcomings in the construction process. Villagers claim that the soil has been sliding towards the road surface for days, and that the condition could worsen dramatically under the load of commercial trucks.

NHAI’s project director, Manish Kumar, visited the site promptly and ordered a special investigation team to conduct a thorough technical audit. The team will examine the sub‑grade, embankment compaction, and quality of the bituminous surfacing to determine the root cause of the failure.