Friday, March 29, 2024

In the same shutdown, the corporation dealt with many tasks, working on the target of heat so that the water problem does not happen

Must Read

Automation work of Amrit Mission Raipur Jalavardhan Yojana (Phase-1) is being done. 80 MLD under it. Shutdowns were carried out on 11 and 12 January at Intakewell and WTP. An electromagnetic flow meter of 1000 mm diameter has been installed at Intakewell. With this, real time measurement of the amount of RaW water received from 80 MLD intakewell can be taken. Jal RK Choubey, Chief Engineer, Municipal Corporation Raipur, said that similarly in 80 MLD WTP, 1200 mm diameter electromagnetic flow meter has been installed in the Clear Water Rising Main. Monitoring and controlling of both electromagnetic flow meters will be done through wireless communication system, RTW through PLC SCADA in the master control room located in the filter plant. In shutdown, NRV and butter fly valves of newly installed 6 Nos. Centrifugal pumps were installed in 80 MLD WTP. Pressure transducers and actuators have also been installed. This has made it possible to monitor and control the clear water pumping system through PLC SCADA. All pumps of 80 MLD have been refurbished in the shutdown. This will eliminate the lack of clear water.

Latest News

Forest staff spilled jam in Holi Milan program, threw liquor bottles in the park itself, VIDEO viral on social media

Shivam Mishra, Raipur. IFS Association organized Holi Milan at Rajiv Smriti Forest Park in the capital, where bottles...